青银高速公路济南黄河大桥跨大堤桥为主跨140 m的预应力混凝土连续梁桥,为保证桥梁成桥线形和应力与设计一致,施工中采用了施工控制。文章分析了施工过程中主要工艺参数的控制技术:用自适应控制方法控制施工预拱度;通过实测信息,调整和修正有限元计算参数;借助应变测量,分析了实际结构的真实应力。使桥梁的施工质量处于受控状态,取得了理想的效果。
|
Jinan Yellow River Bridge of Qing-yin freeway is a press tress concrete continuous frame bridge;its main span is 140 m.In order to ensure the bridge linearly and force are accord with design,the process of construction has to be monitored.This paper analyzes some control techniques of main technology parameters during construction of the bridge.Construction cambers are controlled by adaptive control method,through the information of measurement,parameters in calculation of finite element are adjusted and modified,by means of strain gauging,the true stress of the actual structure is known to ensure the construction quality of bridge under control,and the result is ideal.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]张治成,叶贵如,陈衡治,等.大跨度桥梁施工控制结构分析计算方法[J].浙江大学学报(工学版),2004,38(2):210-214.
[2]白海峰.大跨度预应力混凝土连续箱梁施工监测控制研究[J].铁道工程学报,2008,114(3):38-41.
[3]向木生,张世飙,张开银,等.大跨度预应力混凝土桥梁施工控制技术[J].中国公路学报,2002,15(4):38-42.
[4]K ITAHARA M,ACHENBACH J D,GUO Q C.Neural Network for Crack-Depth Determination from Ultrasonic Back Scattering Data[J].Review of Progress in Quantitative Nondestructive Evaluation,1992,11(6):701-708.
[5]王向阳,李卫华,汪娟娟,等.连续刚构桥梁施工控制仿真分析研究[J].武汉理工大学学报(交通科学与工程版),2007,31(4):709-711.
[6]向木生.连续刚构桥梁施工控制分析[J].武汉理工大学学报,2002,24(6):44-47.
[7]向中富.桥梁施工控制技术[M].北京:人民交通出版社,2001.
|