秦皇岛港煤五期工程为外海作业施工,陆上无法进行测量控制。通过GPS测量定位系统与传统施工工艺相结合,提高了测量定位精度和施工效率,满足了施工需要。尤其是GPS在基床抛石整平和沉箱安装中的应用取得很好的成效,值得在类似工程中推广。
|
The project of Qinhuangdao Phase V Coal Terminal is working on the sea,and it is difficult to control measurement on land.Combination of GPS surveying system and traditional construction technology improves accuracy of surveying positioning & efficiency of constructing and satisfies requirements of engineering.Especially,application of GPS in leveling of rubble bed & placing of caisson is worthy of popularizing in similar projects.
|