船坞的渗漏是一个普遍存在的问题,在该船坞的处理中,采用了截、导、堵综合处理方案,较好的解决了船坞渗漏问题。经一个季度、两批新船出坞的使用没有再次发生渗漏现象,说明处理方案是有效可行的。
|
Leakage in docks is a general problem.During the treatment of leakage in a dock,the methods of interruption,di-version and blocking were jointly used to solve the problem of leakage and got satisfactory results.After being used for a quarter of a year with two batches of new ships being built in the dock,the dock developed no more leakage,indicating that the method of leakage treatment is effective and feasible.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]田稳苓,姜芳禄,陈向上.抗裂防渗水工混凝土基本性能试验研究[J].中国港湾建设,2006,(6):21-24.
[2]袁文忠,常小林,管智福.高压摆喷桩在地下连续墙施工中的应用[J].地基处理,2007,18(2):35-40.
[3]JTJ268-96,水运工程混凝土施工规范[S].
|