现浇密肋楼板早拆体系施工
作者:李会良  
单位:中交一航局第四工程有限公司  
关键词:塑料模壳  早拆体系  施工工艺  质量控制 
分类号:TU755.22
出版年,卷(期):页码:2009,33(6):50-51
摘要:
介绍了天津港二、四公司新建业务楼工程采用高塑模壳现浇密肋楼板早拆体系施工。突破了传统的密肋楼板施工工艺和密肋高度的局限。该工艺施工简单,变模板安装作业为直线铺设,可实现模板早期拆除,并多次周转利用。结果表明,此工艺施工的密肋楼板结构新颖美观,工程造价低,具有较好的前景。
This paper introduces that the new business building projects of Tianjin Port Second and Fourth Company using the Plastic CodeLine Early-dismantling System of Cast-in-site Rib Floor for constructing.It breaks out the limit of traditional Rib Floor construction technology and the height of rib.The construction of this technology is simple,it changes the installation exercise of template into laying a straight line,can be realized early dismantle the template and the use of multiple turnover.The results show that the rib floor structure of this construction is fashionable and attractive;the project cost is low and has good prospects.
基金项目:
作者简介:
参考文献:
[1]吴方伯,汪幼林,周绪红,等.混凝土密肋空心楼盖试验研究[J].建筑科学与工程学报,2006,(1). [2]刘群,杨进春.大跨度空间密肋楼盖板设计计算的拟板解法[J].建筑科学,1997,(06). [3]梁启钊.塑料模壳在建筑工程上的应用[J].广州建筑,2007,(5). [4]远方,高志涛,时春波.密肋楼板结构体系与普通梁板结构体系的技术经济对比[J].四川建筑科学研究,2007,(1).
服务与反馈:
文章下载】【加入收藏
首页 编委会 理事会 期刊检索 过刊浏览 广告合作 联系我们 EngLish

津ICP备11001124号-2
《中国港湾建设》编辑部     地址:天津市河西区大沽南路1002号
电话:(022)28348642   传真:(022)28348642 
邮箱:zggwjs@126.com    邮政编码:300222