期刊总览首页编委会理事会期刊检索过刊浏览广告合作联系我们EngLish

欢迎投稿    欢迎订阅    衷心感谢广大读作者的大力支持与合作!

位置:首页 >> 期刊文章
3万吨级全直桩梁板式集装箱码头施工技术
作者:王海平 谢贤举 张世达  
单位:中交第二航务工程局有限公司 中国港湾工程有限责任公司 中国港湾工程有限责任公司 湖北武汉430014 北京100027 北京100027 
关键词:PHC桩  箱梁  横梁  纵梁  前沿线  板壳结构 
分类号:U656.135;U655
出版年,卷(期):页码:2008,32(1):44-48
摘要:
孟加拉吉大港新锚地集装箱码头为全直桩梁板式结构,该码头设计船型为3万吨级。在此之前,国内全直桩梁板式码头的设计船型均未达到3万吨。该码头设计新颖,对施工要求较高。文章介绍了该码头桩基,箱梁,梁、板,面层及附属结构的施工技术和质量控制。
The container wharf at New Anchorage in Chittagong,Bengal,is of a structure with all vertical piles and topped with beams and slabs and the wharf was designed for accommodation of ships up to 30 000 dwt.The design vessel for domestic wharfs with all vertical piles topped with beams and slabs had never reached 30 000 dwt before the container wharf.The wharf was designed novel and demanded high from the construction point of view.The paper describes the technical measures for the construction of the pile foundations,box girders,beams and slabs and the quality control measures.
基金项目:
作者简介:
参考文献:
服务与反馈:
文章下载】【加入收藏
首页 编委会 理事会 期刊检索 过刊浏览 广告合作 联系我们 EngLish

津ICP备11001124号-2
《中国港湾建设》编辑部     地址:天津市河西区大沽南路1002号
电话:(022)28348642   传真:(022)28348642 
邮箱:zggwjs@126.com    邮政编码:300222