位置:首页 >> 期刊文章
|
摘要:
|
介绍了60~67m超长、600mm×600mm断面的预应力混凝土方桩及六点吊桩工艺应用于常熟兴华港区二期工程的设计与施工情况。
|
The paper presents an introduction to the prestressed concrete square piles of 60-67 m long with a profile of 600 mm×600 mm and the six-point handling technology as well as the application of the technology in the second phase of Xinghua Port Complex in Changshu.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|