通过使用丹麦DHI公司开发的平面二维河口与海岸模拟软件MIKE21-BW模型,运用波浪数学模型方法,对日照港工作船码头防浪措施工程总平面设计方案的可行性进行了论证。通过工程前后对比试验,确定了合理的设计方案,同时也指出了设计中应该注意的一些问题。
|
With the MIKE 21 - BW model, a software for simulation of 2D estuaries and coasts developed by DHI, and the wave mathematical modeling procedure, the feasibility of a design scheme for the general plan layout of the wave breaking facilities for the work boat wharf in Rizhao Port was verified. A rational design scheme was then determined and in the meantime, some aspects that should be taken into consideration during a design were also recommended.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]赵智帮,刘子琪,孙精石,牛恩宗.深水航道对波浪传播影响规律的研究[J].中国港湾建设,2001,(6).
[2]刘子琪,丁广佳.锦州港新建工程港区防浪试验研究[J]港工.技术,2003,(Z1).
[3]尹宜英.锦州港五港池总平面设计方案可行性试验研究[J].中国港湾建设,2005,(3).
|