摘要:
|
原200t半圆体预制场已不能满足大型半圆体和箱筒的生产要求。通过对场地的整体规划设计、改造,使整个场地得到了有效的利用,满足500t半圆体和混凝土箱筒的预制及出运,优化了工艺,提高了效益。
|
The original precasting yard for 500 t semi-circular cylinder was unable to meet the production requireme-nts. The whole programming design and reformation of the precasting yard makes the whole yard get validexploitation, and meets the requirements of transportation of 500 t semi-circular cylinders and concrete caissoncylinders, optimizing the technology and improving the performance.
|