位置:首页 >> 期刊文章
|
摘要:
|
针对在复杂的水文、地质、河势条件下进行桥墩基础冲刷防护施工难度大的特点,结合施工工艺和方法,对苏通大桥主桥4号主塔墩冲刷防护施工中的重点难点、施工中出现的不利情况及应对措施进行了分析研究。
|
According to features of diffcult anti-washing construction of pier foundation under compley hydroraphic,gological, and water potential conditions, combining construction condition methods, author analyze and conclude keypoints and difficulties of anti-washing construction of the fourth main pier of Great Sutong Bridge, and difficulties inconstruction and relevant countermeasures.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]高正荣,卢中一,袁文志.苏通长江公路大桥主桥墩施工期冲刷防护试验研究[R].南京水利科学研究院河港研究所,2003.
[2]何平,吴寿昌,俞先林.苏通大桥主塔墩冲刷防护技术[A].苏通大桥论文集.(第二集)[R].
[3]刘自明,王邦楣,陈开利.桥梁深水基础[M].北京:人民交通出版社,2003.
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|