位置:首页 >> 期刊文章
|
摘要:
|
针对北部湾地区外海大型油码头海上现浇墩台施工工序多、工作环境恶劣、海况复杂、施工难度大等问题,重点论述了墩台施工方案、施工工艺、控制要点和一些技术难题的解决办法。
|
In view of the problems of complex construction procedures, odious working conditions, complicated sea conditions and difficulty in construction the cast-in-situ pile caps for an offshore large oil terminal in Beibuwan Gulf, the paper lays emphasis on the solutions to the method and technology of construction, control points and some other technical issues for the construction of the pile caps.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|