位置:首页 >> 期刊文章
|
摘要:
|
主要介绍了10万吨级船台围堰工程施工的方法,钢板桩打设过程中出现问题的处理措施,钻孔灌注桩地下连续墙的应用,水上砼方块直立堤的施工工艺。
|
The paper describes mainly the methods for the construction of the cofferdams for a slipway for ships up to 100 000 dwt;measures to solve the problems encountered during the installation of steel sheet piles;application of bored cast-in-situ concrete diaphragm walls;and technology for building upright concrete block dams.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|