通过试验段的监测结果分析,并结合理论计算,对设计工艺进行了优化,提出了相对合理的加荷过程及控制标准。在保证工程质量的前提下,快速推进工程的施工。
|
Based on the analysis of the measured results of the trial section of the breakwater and the theoreticalcalculations,the designed technological process was optimized and relatively rational standards for the process ofload application and control of the application were proposed.With the quality of the works being guaranteed,theimplementation of the project was greatly expedited.
|