位置:首页 >> 期刊文章
|
摘要:
|
主要叙述了渤海石油输灰码头改造过程中老码头钢管桩拔除的施工工艺,重点对钢管桩拔除过程中所采取的措施进行了介绍。
|
The paper mainly deals with the technology for extraction of steel tubular piles during the rebuilding ofan old jetty for Bohai Petroleum Company and the measures taken during the extraction of the steel tubular piles.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|