介绍了在工期紧、施工现场流水作业相互干扰大的情况下,尽快排除粉细砂中孔隙水,保证路基回填土压实度等指标的基础加固方法。
|
The paper introduces a soil improvement method with which the pore water in silty find sand was rapidlyremoved to ensure the achievement of the required degree of compaction of the reclaimed material for the subgradeof a road when the working schedule was tight and work on the site heavily interfered with each other.
|