摘要:
|
在分析九龙坡河段成库前后通航水流条件及河演趋势的基础上,初步拟定了九龙坡河段的整治方案,并通过实体模型试验,对整治效果进行了分析,认为通过浅碛开挖与修建整治建筑物相结合的方法,可以解决九龙坡河段的泥沙淤积及其碍航问题。
|
In this paper,based on the analysis of the flow conditions and the trend of river course evolution before and after the Sanxia Reservoir is competed in the Jiulongpo river reach of the Changjiang River,a preliminary scheme for regulating the Jiulongpo river reach is formulated.Based on the prototype model tests,the result of the proposed regulation is analyzed.It is found that,with the method to combine dredging in shoals with building diversion works,the problem of siltation and the resulting obstruction of navigation in the Jiulongpo River reach can be solved.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]三峡库区重庆河段泥沙模型试验研究报告[R].重庆西南水运工程科学研究所,2001.
[2]长江科学院,长江水文局.重庆主城区河段走沙规律分析报告[R].2002.
[3]重庆主城区河段泥沙冲淤变化对港口、航道的影响及治理措施研究报告[R].重庆西南水运工程科学研究所,2004.
|