通过现场实测水文泥沙资料分析,对进一步延伸南、北防波堤的减淤效益进行了计算分析。口门延伸至15+0处是可行的,在进一步扩大港口规模的同时,还能使全港的回淤量减少约60%。
|
Based on the analyses of the hydrological and sediment data measured on site,calculations and analyses are made on the benefit to gain from the reduction of siltation by further extending both north and south breakwaters in Tianjin Port.It is feasible to extend the entrance to the port to 15+0.The siltation may be reduced by about 60% in the whole port while the size of the port can be further enlarged.
|