位置:首页 >> 期刊文章
|
摘要:
|
简要介绍了沉箱预制冬期施工中采取的两种不同的加温保温养护工艺,并对其实施效果作了比较,从而对沉箱预制冬期施工所采用的措施提出了自己的看法。
|
The paper presents two different techniques of warming-up and thermal insulation for curing caissons being prefabricated in winter seasons.The results of the two techniques have been compared and the measures for prefabrication of caissons in winter seasons are also proposed.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|