位置:首页 >> 期刊文章
|
摘要:
|
文章对高速公路桥上部结构箱形梁的预制、安装及连结混凝土的施工进行了叙述。并对施工中的几个问题和处理方法提出了一些建议。
|
The paper expounds on the prefabrication and installation of box girders and the construction of concrete to connect the superstructures of the boxgirder bridges during the construction of express highway Some recommendations are given in respect of some issues encountered during the construction and their countermeasures
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|