位置:首页 >> 期刊文章
|
摘要:
|
本文主要介绍了深圳港妈湾港区 2号泊位工程施工对海底排污管线的影响以及采取的措施
|
This paper introduces the impact of construction of No.2 berth in Mawan Port in Shenzhen Port complex on the blowdown pipeline in the sea floor and the measures taken against the impact.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|