采用石灰桩复合地基处理法进行地基处理后,并没有达到预期的效果,分析原因,主要是因为本工程采用石灰桩的位置有许多不妥之处。通过总结经验教训,得出应针对不同位置,不同土质条件,采取不同的地基处理方法的结论。
|
The desired results were not achieved using composite lime column method totreat foundations. Through analysis it was found that the main reason is the im-proper positoon of lime columns appplied in the project. The warning was takenfrom the project that different foundation improving methods shall be usde in thedifferent poeitons and conditions of soil properties.
|