球磨机房储料仓施工
|
作者:刘君实 |
单位: |
关键词:球磨机房 漏斗 熟料 逆施工 |
分类号:TU7 |
出版年,卷(期):页码:1997,21(5):5-7 |
摘要:
|
球磨机房漏斗上部直立壁为深梁,下部为四角锥形薄壁漏斗,如由下而上施工,则其自重以及模板荷载,为楼层板设计荷载的7倍,为解决这一问题,采取了自上而下的逆施工方法。
|
The vertical wall for supporting hopper in the ball mill house is a deep beam, down the hopper is a thin wall hopper of quadrangular pyramld. The dead weight of the hopper and the load of formwork are 7 times as much as the design load of floor slab, if the construction is carried out from the bottom to top, the inverse construction program from top to bottom should be adopted in order to settle this problem.
|