位置:首页 >> 期刊文章
|
摘要:
|
文章主要介绍了武汉军山长江公路大桥B标主桥钢箱梁安装及斜拉索张挂的施工过程及方法,同时对主桥的施工监控进行了叙述。
|
The methods and process of installation of the steel box girders and cable stays for the main bridge for Contract B of Junshan Highway Bridge over the Changjiang River in Wuhan are mainly described in the paper.In the meantime,the monitoring and control of the construction of the main bridge are also described.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|