位置:首页 >> 期刊文章
|
摘要:
|
厦门东渡港区三期工程两端紧邻码头,采用爆夯法施工产生的震动是否对周边码头产生不利影响还没有可靠的参考数据。该文叙述了码头抛石基床爆夯密实试验方法的设计和实施的成功经验,可指导下一步的施工。
|
For the berths neighbouring with the two sides of the 3rd phase project of the Dongdu port area of Xiamen, whether the vibration caused by the construction operation by means of compaction by blasting has an adverse effect on the neighbouring berths,there is still no reliable reference data. This paper describes the design and successful experience in practice using compaction by blasting on a rebble mound foundation, and provides the guidance for the undergoing and later construction.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|