本文介绍盐田港集装箱码头二期工程,海上嵌岩灌注桩施工技术,着重介绍嵌岩钻孔斜桩施工、施工钻孔设备、海上施工平台、嵌岩桩内嵌岩锚杆的施工法、水下二次浇注混凝土接合面的处理、斜桩水下浇注混凝土法、施工事故和质量事故的处理及对策等
|
This paper introduces the construction technology of rock socketed cast in situ piles for the second stage project of the Container Terminal of Yantian Port. An emphasis is laid on the construction of drilled rock socketed tilt piles, drilling equipment, offshore construction platform, the construction method of anchored bars inside the rock socketed piles, the treatment of the interface between the first layer and the second layer of the placed concrete, underwater concrete casting of tilt piles,handling of construction accident and quality defects and measures to be taken.
|