位置:首页 >> 期刊文章
|
摘要:
|
本文着重叙述了中远六万t级船坞在湿法施工条件下的坞室结构设计方案,其中包括坞墙、坞室底板及坞口结构等,对存在的问题进行了分析
|
The paper presents the design proposal for the wet construction of the dock chamber structure of Zhongyuan 60000 dwt Dock, including the dock walls, bed plate of the dock chamber and dock entrance. The problems encountered during the construction are also analyzed herein.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|