中远6 万t级船坞工程的坞门为气控式双面板卧倒式坞门,由于工期原因,采用干地安装,其中克服了许多技术难题,对确保工期起到了重要作用
|
The dock gate of Zhongyuan 60000 dwt Dock is a pneumatically controlled flap dock gate with double side panels. Because of the restrictions of the completion period, the installation of the flap gate was conducted in the dry. Many technical problems were solved in the process of installation, thus playing an important role in the completion of the project in time.
|