位置:首页 >> 期刊文章
|
摘要:
|
本文系统地论述了中远船坞干地施工的全过程,完成了矿石升浆砼与顶板现浇钢筋砼两层板之间的连接处理工作。
|
The paper systematically describes the whole process of the construction of Zhongyuan Dock in the dry and the treatment of the interfacing of the prepacked aggregate concrete with the cast in situ reinforced concrete of the deck.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|