位置:首页 >> 期刊文章
|
摘要:
|
秦皇岛港煤四期翻车机房结构复杂 ,建设周期长 ,是煤四期工程的关键项目 ,其中输煤漏斗钢筋砼横梁的施工则是翻车机房工程的重要环节。本文主要介绍了该横梁施工所采用的支模工艺、钢筋绑扎工艺和混凝土施工及防裂措施
|
The dumper shed,with a complex structure and a long construction period,was the key project for the fourth phase of the coal terminal in Qinhuangdao Port Construction of the crossbeam for the funnel was the key link of the dumper shed This paper presents mainly the technology for erecting the formwork and fixing the reinforcement as well as concrete construction and crack control measures for the construction of the cross beam
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|