位置:首页 >> 期刊文章
|
摘要:
|
在科威特舒艾拜油码头工程砼施工中 ,对砼的配比、搅拌、输送、出模温度、作业的可靠性都有很高的要求。文中介绍了针对上述要求对三航砼 7船进行的技术改造措施和效果。
|
During the rehabilitation of Shuaiba Oil Pier in Kuwait, the concrete used in the works demanded strict requirements for mix ratio, batch and mixing, transportation, temperature of concrete at placing, and reliability of placement operations. To meet the above requirements, technical innovation was carried out on TNEB-Concrete Barge No 7. The paper presents the innovative measures and the result of the technical innovation.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|