位置:首页 >> 期刊文章
|
摘要:
|
在科威特舒艾拜油码头南码头的重建工程中 ,经过方案优选 ,用临时桩方案作为深海支撑结构。在施工中用同一支撑系统“一物两用”作为拆、建的临时承重结构 ,降低了成本 ,提高了工效。
|
During the rebuilding of South Jetty at Shuaiba Oil Pier, a temporary pile structure was dopted as the deep sea bracing structure, which was also used as the temporary bearing structure for removing the old structure as well as rebuilding the structure, thus cutting down the construction cost and improving the working efficiency.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|