位置:首页 >> 期刊文章
|
摘要:
|
熟料卸车廊道施工属半地下结构,其南端与一档水石坝相邻。本文专述在水补给充分,又有强渗透性砂层的特殊条件下,采取大口井抽水与帷幕止水相结合的基坑开挖降水的体会。
|
The clinker car-unloading gallery was a semi - underground structure, its south end borders a water protection dyke. An experience of combining a large water- pumping well with a sealing curtain technique was adopted for dewatering in the excavation of foundation trench, under the special conditions of full water supply and strong permeable sand layers.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|