位置:首页 >> 期刊文章
|
摘要:
|
本文以实例分析了在天津港南疆大桥建造过程中,解决施工与通航矛盾应考虑的问题。
|
A case analysis on the problems to resolve the contradictions between the execution ofproject and navigation in the construction at the Nanjiang Bridge in the Port of Tianjin is describedin this paper.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|