位置:首页 >> 期刊文章
|
锦州港码头基础工程的防淤和清淤
|
作者:张华玉 |
单位: 一航局五公司 |
关键词: |
分类号: |
出版年,卷(期):页码:1991,15(2):42-45 |
摘要:
|
本文概述了锦州港重力式码头基础工程,在施工期间淤积较严重的情况下,为保证基础工程的施工质量,确定以“防淤为主,清淤为辅”的原则,施工中采取了几方面的防淤措施,从而使码头基础工程的施工质量得到控制和保证。
|
This Paper generally described the foundation construction of the gravity wharf in Jinzhou port. The silting used to be rather severe during the construction. For ensuring the constriaetion guality, Ta principle of "Putting prevention first and cleaning second" was adopted. Various measures of silt preventing were taken in construction, so that the construction quality of foundation work was controlled and guaranteed.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|