位置:首页 >> 期刊文章
|
摘要:
|
南极中山站鸳鸯群岛拟建设卸货码头工程,按计划首先建设受潮汐、波浪影响的海堤道路。由于工程基础资料贫乏,施工条件特殊,中国第22次南极考察队项目组,行前进行了充分的技术准备,对土工材料进行模拟南极自然条件的性能试验研究。现场实施中结合实际解决了关键性技术问题并优化了设计实施方案,按计划完成建设任务。
|
A cargo-unloading wharf was planned at Yuanyang Archipelago for China's Zhongshan Prospecting Station.As was planned,a road on the sea wall,which is affected by tides and waves,should be first built.As the basic data and information for the project was short and the construction conditions were peculiar,the project group of China's 22nd Scientific Prospecting Team for the South Pole made sufficient technical preparation before they departed for the South Pole and the geotechnical materials for the project were tested for their performance in the simulated natural conditions at South Pole.During the construction of the sea wall road,key technical problems were solved and the designs were optimized in accordance with the practical conditions on site,thus completing the project as scheduled.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]王琦,等.中山站鸳鸯群岛卸货码头工程土工布冻融试验报告[R].上海勘测设计研究院检测站,2005.
|
服务与反馈:
|