洋口人工岛是南通洋口港区陆岛跨海通道的终点、现代物流仓储的基地和液化天然气接收站的承载平台。文章以洋口人工岛工程为例,以水力计算为理论依据,从龙口的合龙时机、龙口位置和宽度确定、龙口防护、堵口方法和顺序以及龙口合龙过程中需注意的要点几个方面对龙口的合龙进行了分析和探讨。
|
Yangkou Artificial Island is the terminus of sea-crossing passage between the land and the island in Yangkou Port Area in Nantong,which is also the modern base for logistics and warehousing and the bearing platform for receiving LNG.Taking Yangkou Artificial Island for example and taking hydraulic calculations as the theoretic basis,the paper makes analyses and researches of the closure construction from the viewpoints of choosing right time for closing the closure gap,determination of the location and width of the closure gap,protection of the closure gap,methods and sequence of closing and key points needing attention during the closing operation.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]陈吉余.中国围海工程[M].北京:中国水利水电出版社,2000.
[2]严恺.中国海岸工程[M].南京:河海大学出版社,1992.
[3]康世荣.水利水电工程施工组织设计手册[K].北京:中国水利水电出版社,1997.
[4]陈德春.围海工程堵口合龙技术研究[J].河海大学学报,2002,30(5):67-70.
[5]范期锦.沿海堤坝工程的合龙施工[J].中国港湾建设,2004,(4):1-4.
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|