摘要:
|
文章给出了国际上工程设计阶段划分的方法;分析了国际EPC合同中关于业主对设计管理的惯例规定,包括设计范围、设计依据和技术标准、设计文件检查和审批、设计责任、竣工文件和操作维护手册编制和提交等;并讨论了业主方设计管理中的设计标准、设计责任、设计审批争议、设计文件的知识产权等关键问题。
|
This paper presents methods for the division of design phase of international EPC projects and analyzes the general practices for the design management of the owner,including the design scope,design basis and technical standards,review and approval of the design documents,design responsibility,compilation and submission of the completion documents and operation and maintenance manuals.It also discusses the key issues in Owner's design management,such as design standards,design responsibility,design disputes and intellectual property rights in design documents.
|
基金项目:
|
国家自然科学基金资助课题,项目批准号(70772057)
|
作者简介:
|
|
参考文献:
|
[1]Chris Hendrickson,Tung Au.Project Management for Construc-tion:Fundamental Concepts for Owners,Engineers,Architects andBuilders[M].Prentice Hall,2000.
[2]周泽均,郑亚军,林竹.设计管理在建设工程咨询服务中的作用[J].中国工程咨询,2007(8):30-32.
[3]Patricia Tzortzopoulos,Rachel Cooper.Design Management from aContractor's Perspective:The Need for Clarity[J].ArchitecturalEngineering and Design Management,2007,(3):17-28.
[4]马骅.国际工程EPC项目的设计管理[J].石油工程建设,2005,(2):72-76.
[5]Austin S,Baldwin A,Newton A.A data flow model to plan andmanage the building design process[J].Mach.Learn.,1996,7(1):3-25.
[6]Gray C,Hughes W.Building Design Management[M].Oxford:Butterworth-Heinemann,2001.
[7]F Mushtaq,P W H Chung.A systematic Hazop procedure for batchprocesses,and its application to pipeless plants[J].Journal of LossPrevention in the Process Industries,2000,13(1):41-49.
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|