位置:首页 >> 期刊文章
|
摘要:
|
广东华厦阳西电厂配套深水防波堤兼码头分一、二期建设。其一期工程的端头,采用了直立式墙封堵的结构型式。这种结构型式,对于承受多向、较大波浪力作用的深水码头是适宜的,同时工程量小,工期短,造价低。就本工程而言,是一种较好的结构型式。
|
The deepwater breakwater(concurrently a jetty)matching for Huaxia angxi Power Station of Guangdong shall be built by two(2)stages,i.e.Stage No.1 and Stage No.2.The head of the breakwater shall adopt a vertical wall plugging structure in Stage No.1.This type of the structure is suitable to deepwater breakwater(jetty)suffering from effect of heavy wave force from multi-directions.At the same time,this structure can shorten construction period,reduce costs,and it is a good structure form.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]陈万佳.港口水工建筑物[M].北京:人民交通出版社,1989.
[2]天津市海岸带工程有限公司.广东华厦阳西电厂配套码头工程初步设计[R].2005.
[3]JTJ298-98,防波堤设计与施工规范[S].
[4]JTJ290-98,重力式码头设计与施工规范[S].参考文献:
|