位置:首页 >> 期刊文章
|
摘要:
|
根据多年的现场施工经验,针对真空预压法施工过程中存在的有关问题进行了总结,并提出了解决的主要控制点和对策。包括:前期准备与勘测、施工垫层、砂垫层的厚度及含泥量讨论、排水板施工、滤水管及真空出膜装置布设、密封沟的讨论等。供有关施工技术人员参考。
|
Based on many years field experience,author sums up and puts forward key control points and some countermeasures to solve problems in view of the existed problems in the construction of vacuum preloading method.These measures include first-phase preparation and investigation,construction cushion layer,thickness and silt content of sand cushion layer,construction of wick drain,arrangement of filter pipe and vacuum stripping device and sealing ditch,etc.and can provide a reference for technical personnel.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|