连云港港25万吨级矿石接卸码头工程总体设计
作者:兰加智 
单位: 
关键词:矿石码头 总体设计 港口工程 
分类号:
出版年,卷(期):页码:2011,32(2):17-20
摘要:

摘要:连云港港25 万吨级矿石接卸码头工程是我国目前一次性建设规模最大的矿石码头,是连云港港旗台作业
区建设的第一座码头,因此其码头的布置形式、码头前沿线位置、码头面高程和陆域高程的确定尤为重要。文中从
总体布置、平面布置等方面论述了该工程的总体设计思路。工程建成后运转正常,为旗台作业区后续工程的建设奠
定了基础,提高了我国大型专业化散货码头的工艺水平。

Abstract: 250 000 Tons ore discharge terminal project of Lianyungang Port is the largest ore terminal for one-time
construction in China at present,and is the first terminal of Qitai work area in Lianyungang Port,so it is important to
determine the general arrangement of terminal,the front line location,the terminal top elevation,and the land area elevation.
This paper discusses the overall design thought from the aspects of general layout,plane layout and etc. The project was well
running after it completed,laid the foundation for the following works in Qitai work area,and improved the technological level
of large-scale specialized bulk cargo wharf in China.

基金项目:
作者简介:
兰加智(1970 — ),男,湖北黄冈市人,高级工程师,港口 工程专业。
参考文献:
服务与反馈:
文章下载】【加入收藏
首页 编委会 理事会 期刊检索 过刊浏览 广告合作 联系我们 EngLish

津ICP备11001124号-2
《中国港湾建设》编辑部     地址:天津市河西区大沽南路1002号
电话:(022)28348642   传真:(022)28348642 
邮箱:zggwjs@126.com    邮政编码:300222