“定机移船”卸煤码头装卸工艺设计
作者:魏恒州 柳玉涛 
单位: 
关键词:关键词:卸煤码头 定机移船  装卸工艺 固定式悬链斗卸船机 
分类号:
出版年,卷(期):页码:2011,32(3):31-34
摘要:

摘要:在海港煤码头设计中应用“定机移船”码头工艺。根据印度尼西亚风港2伊115 MW燃煤电厂卸煤码头工程
设计,分析研究“定机移船”卸煤码头的合理工艺流程和最佳平面布置;推导出码头主尺度、移船阻力、移船绞车
功率和码头通过能力的计算公式;并提出固定式悬链斗卸船机的选型和配备方法。实践证明,“定机移船”卸煤码
头工艺是接卸以大舱口浅底驳船为主的卸煤码头的最佳设计方案。

Abstract:The handling technology of the Fixed Ship-unloader for Moving Ship is used to the design of coal unloading terminal
in seaport and based on the coal terminal project of LABUHAN ANGIN 2×115 MW coal-fired power plant in Indonesia,the
analysis has been conducted on the logical handling process and the first-rank general layout of the Fixed Ship-unloader for
Moving Ship in the coal terminal. The formula has been worked out for calculation of the main dimensions of wharf structure,
ship moving force, ship-moving winch power and the throughput of the terminal. The method of selection and configuration of
fixed catenary chain bucket ship-unloader has been proposed. It has been proved that the Fixed Ship-unloader for Moving Ship
is an optimal design based on unloading barge with large hatch in coal terminal.

基金项目:
作者简介:
参考文献:
服务与反馈:
文章下载】【加入收藏
首页 编委会 理事会 期刊检索 过刊浏览 广告合作 联系我们 EngLish

津ICP备11001124号-2
《中国港湾建设》编辑部     地址:天津市河西区大沽南路1002号
电话:(022)28348642   传真:(022)28348642 
邮箱:zggwjs@126.com    邮政编码:300222