Abstract:The Donghai Bridge sits astride Kezhushan Islands,so the technical program of blasting for hills must ensure the
bridge security. This paper introduces the presplitting blasting parameter, controlled blasting parameter, the technical
measures to reducing vibration and preventing slungshots,safety analysis and monitoring scheme for the blasting of Kezhushan
Hill,and the hills are successfully exploded under strict control.
|