期刊总览首页编委会理事会期刊检索过刊浏览广告合作联系我们EngLish

欢迎投稿    欢迎订阅    衷心感谢广大读作者的大力支持与合作!

位置:首页 >> 期刊文章
海上风电场风机桩基局部冲刷计算
作者:王卫远 杨娟 李睿元 
单位: 
关键词:海上风电场 局部冲刷 经验公式 
分类号:
出版年,卷(期):页码:2011,32(6):13-15
摘要:

建设海上风电场时,风机所处的环境十分复杂,在风、浪、流等要素的影响下,风机桩基周围会出现冲刷
坑,而风机桩基的局部冲刷深度是工程设计的重要参数。采用胜利埕岛油田海洋平台桩基局部冲刷现场观测资料,
对常用的两个桩基局部冲刷经验公式进行验证,并对拟建的风电场工程风机桩基的局部冲刷深度进行计算,计算结
果具有一定的参考价值。

When a wind farm in built offshore,the environment where the wind turbines are erected is very complex. Scour
around piles for wind turbines will develop because of the actions of winds,waves and currents. However, the local scour depth
around the pile foundations for wind turbines is an important parameter for engineering design. The field data of scouring around
the pile foundations for the offshore oil platforms at Chengdao oil field are used to verify the two commonly used empirical
formulas for local scouring around pile foundations,and then,the local scouring depth around the pile foundations for a
proposed wind farm is calculated. The calculation results are of reference for the project.

基金项目:
作者简介:
参考文献:
服务与反馈:
文章下载】【加入收藏
首页 编委会 理事会 期刊检索 过刊浏览 广告合作 联系我们 EngLish

津ICP备11001124号-2
《中国港湾建设》编辑部     地址:天津市河西区大沽南路1002号
电话:(022)28348642   传真:(022)28348642 
邮箱:zggwjs@126.com    邮政编码:300222