<p>In the light of the actual situations in the construction of the breakwater and the prefabrication of Core-Loc Units for<br /> a deep water container terminal in Pakistan and based on the field surveys of some local projects in Pakistan,the five main<br /> factors,such as manpower, machinery,material,methodology and environment, which affect the quality of the precast<br /> Core-Loc Units,were analyzed. On the basis of the analyses,different counter-measures and implementing procedures to<br /> fulfill them were formulated,gaining experience for similar future works.</p>
|