Abstract:Yunliang River Bridge use the horizontal swivel method for continuous beam construction which across the existing
Harbin-Dalian passenger line. A re-weighing test and analysis is carried out to ensure the smooth swivel. This paper presents
an unbalanced weight test method and application process. The results show that the method is effective and feasible, can pro原
vide references for similar projects.
|