Abstract:The fourth contract section of Guangzhou-Shenzhen highway along the river is coastal shoal bridge construction,
which has complex geological conditions, great influences by tide,large numbers of structures and relatively simple struc原
tures. In view of the actual situation,the tied-beam and pile cap use the streamline fabricated construction of prefabrication
and installation,the pier stud use the non-scaffold construction technology,the construction efficiency is greatly enhanced,
the material consumption is reduced, the construction period is shortened,and good economic benefit is achieved.
|