Abstract:Through the right side of the intersection positioning,the positioning of the angle of intersection, the corner loca原
tion in the intersection and the polar coordinates of the location in the theory and research,this paper proposes suitable for
measurement of the positioning of inshore immersed tube tunnel underwater construction tower total station positioning and the
optimal parameters for engineering applications,and tests the correctness and operability of the conclusions by actual pro原
jects
|