期刊总览首页编委会理事会期刊检索过刊浏览广告合作联系我们EngLish

欢迎投稿    欢迎订阅    衷心感谢广大读作者的大力支持与合作!

位置:首页 >> 期刊检索
期刊检索:
文章标题文章作者年,卷(期):页码
·   2024 ,1(7):0-0
·   2024 ,1(7):00-00
· Technology for super long distance floating transportation of immersed tubes WU Feng-liang, LIU Fu-xin, MA De-sen 2024 ,1(7):01-05
· Evaluation of closure gap length of immersed tube tunnel in Shenzhen-Zhongshan Link LIU Zhao-quan, SUO Xu-hong, SU Xiao-ning 2024 ,1(7):06-10
· Development and application of floating measurement and control system of steel shell immersed tube based on the integratedbarge for transportation and installation SUO Xu-hong, WANG Ming, NING Jin-jin 2024 ,1(7):11-16
· Structural design optimization and construction technology of wave wall on west artificial island of Shenzhen-Zhongshan Link LIU Jun-qi, NING Hua-yu, ZHENG Wei-tao, WANG Cong-li, XIE Ming-lu 2024 ,1(7):17-20
· Analysis of displacement impact on the island-bridge junction of the Shenzhen-Zhongshan Link west artificial island FAN Wen-ce, GUO Li-dong, YANG Run-lai, ZHU Yi-xin 2024 ,1(7):21-27
· Research and application of controlled cracking technology for cast-in-place tunnel post-casting wall construction in west artificialisland of Shenzhen-Zhongshan Link ZHENG Wei-tao, WANG Cong-li, WANG Shuo, LIU Shuai 2024 ,1(7):28-33
· High-precision docking technology for Shenzhen-Zhongshan Link immersed tunnel based on integrated barge for transportationand installation YUE Yuan-zheng, SUO Xu-hong, LIU Zhao-quan 2024 ,1(7):34-38
· Simulation test of three-dimensional aerial traverse method in deformation monitoring of immersed tunnel construction CHENG Yi-pin, HAN Zhan-wei 2024 ,1(7):39-43
· Research on preloading monitoring method and data analysis of cast-in-place box girder support ZHANG Chao 2024 ,1(7):44-48
· Research and application of leveling scheme for special-shaped pipe segment under multiple working conditions inShenzhen-Zhongshan Link WANG Ming, SUO Xu-hong 2024 ,1(7):49-54
· Design and process study of temporary anchoring system for final joint DONG Hui, GUAN Ze-xu, DENG Bin, ZHOU Xiang-rong, ZHAO Hao-bo 2024 ,1(7):55-60
· Research on reduced-scale watertight push-pull test of final joint M-typed waterstop XUE Meng-qi, ZHU Ling, SUO Xu-hong 2024 ,1(7):61-65
· Design and application of multi-linear interlocking network penetration measurement method for installation of super-large steelshell concrete immersed tube WANG Jian, CHENG Yi-pin, SUO Xu-hong 2024 ,1(7):66-70
· Installation technology of the final joint super-wide and ultra-long M-typed waterstop ZHANG Zhi-lin, MA De-sen, REN Ning, HUANG Bo 2024 ,1(7):71-75
· Research and application of anti-corrosion construction technology for joints of steel shell immersed tube tunnel in open seas GAO Heng, ZHOU Xiang-rong, NING Jin-jin, DONG Hui, CHEN Yi-you 2024 ,1(7):76-81
· Research and application of construction technology of OMEGA waterstop in confined space of steel shell immersed tunnel CHEN Yi-you, WANG Yan-dong, GAO Heng 2024 ,1(7):82-86
· Research on construction step control for offshore ships in immersed tunnels GUAN Ze-xu, CHEN Yi-you, WANG Yan-dong 2024 ,1(7):87-92
· High precision fixed point non - destructive dredging technology for gravel bed ZHU Ling, ZHENG Xiu-lei, TAO Zhen-jie 2024 ,1(7):93-97
首页 编委会 理事会 期刊检索 过刊浏览 广告合作 联系我们 EngLish

津ICP备11001124号-2
《中国港湾建设》编辑部     地址:天津市河西区大沽南路1002号
电话:(022)28348642   传真:(022)28348642 
邮箱:zggwjs@126.com    邮政编码:300222